Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BA0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BA0073","BIP- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI-PURPOSE BUILDING (SABTANG MUNICIPAL BUILDING), PHASE II, BARANGAY SINAKAN, SABTANG, BATANES","GAA 2025 SSP","On-Going",28863367.03,0,69.83,"Batanes DEO","Region II","ACCELERATED METAL TECHNOLOGY & CONSTRUCTION, INC. (32073) / SWIFT DEVELOPMENT AND SUPPLIES CORP. (44778)","2025-06-18",null,2025,"Regular Infra - GAA 2025 SSP",20.33297,121.87423,"200905000","200900000"]
SHA-256
1e6e6be46b077beae100178590ed7218bd4b8fc15097bda58204c5355a6fc7e7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.