Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BB0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BB0046","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, REMUS, BAGGAO, CAGAYAN","GAA 2025 OO-2","Completed",96470000,0,100,"Cagayan 1st DEO","Region II","JWU CONSTRUCTION AND SUPPLY (48659)","2025-02-25","2025-11-10",2025,"Regular Infra - GAA 2025 OO-2",17.97972,121.90667,"201506000","201500000"]
SHA-256
fa5effcb87e6fad3c280efa9f3f1f4d559bd989a57d247fb5787062bc9f8104d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.