Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BE0134

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BE0134","CONCRETING OF BRGY. BARUMBONG FMR, BRGY. BARUMBONG, STO. TOMAS, ISABELA","GAA 2025 DA FMR","On-Going",14700630.87,0,86.31,"Isabela 1st DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) / RSKC CONSTRUCTION (38292)","2026-01-15",null,2025,"Outside Infra - GAA 2025 DA FMR",17.13064,121.87164,"203114000","203100000"]
SHA-256
227cdf8fc6647d4cef539139150a58d431999d0b0b22b078cd21fb8cbbd69c18

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.