Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BF0055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BF0055","OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL STRUCTURE (SAN JOSE SUR SECTION), PHASE II, MALLIG, ISABELA","GAA 2025 OO-2","Completed",93596369.09,0,100,"Isabela 2nd DEO","Region II","JWU CONSTRUCTION AND SUPPLY (48659)","2025-06-16","2026-04-30",2025,"Regular Infra - GAA 2025 OO-2",17.19001,121.56322,"203119000","203100000"]
SHA-256
a18319f9cfd9beafb56dd1868312f79b4a43b93a0dd91d00f608e922605d8229

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.