Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BF0091

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BF0091","CONSTRUCTION OF SCHOOL BUILDING, STA. CRUZ INTEGRATED SCHOOL, SAN MANUEL, ISABELA","GAA 2025 DEPED BEFF","Completed",4825584.79,0,100,"Isabela 2nd DEO","Region II","R.E.A. CONSTRUCTION (49491)","2025-08-04","2026-03-17",2025,"Outside Infra - GAA 2025 DEPED BEFF",17.01581,121.58136,"203130000","203100000"]
SHA-256
7183c406cceccd60d4e11285ef52df71b767aa9792ad8c17657b6c6cbba69b86

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.