Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BG0129

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BG0129","OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY LUCBAN, PHASE 3, BENITO","GAA 2025 OO-2","On-Going",93603047.54,0,100,"Isabela 3rd DEO","Region II","MAV CONSTRUCTION SUPPLY AND POWER DEVELOPMENT (46551)","2025-06-04",null,2025,"Regular Infra - GAA 2025 OO-2",16.99861,121.97746,"203104000","203100000"]
SHA-256
9bcdbfdec9bee05da4991f4e8cbbb7c08fc2a08f285bbd2f002af9037fb67f9d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.