Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BH0053

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BH0053","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINALUGAN FLOOD CONTROL DRAINAGE STRUCTURE STA. 0+000","GAA 2025 OO-2","On-Going",96483397.79,0,58.26,"Isabela 4th DEO","Region II","JWU CONSTRUCTION AND SUPPLY (48659)","2025-08-18",null,2025,"Regular Infra - GAA 2025 OO-2",16.69151,121.87449,"203128000","203100000"]
SHA-256
d9d94441594f3b2c24d4a54dceff396fcf6c15ccfed17d7b5208c3997fef7ee4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.