Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BH0295

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BH0295","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/DRAINAGE PROJECT, BRGY. CABARUAN, CAUAYA","GAA 2025 OO-2","On-Going",55114433.3,0,3.08,"Isabela 4th DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) / MA TESORO CONSTRUCTION (48638)","2025-08-29",null,2025,"Regular Infra - GAA 2025 OO-2",16.93382,121.76601,"203108000","203100000"]
SHA-256
56a70c6e4ff4600fe470a757bd3b8411ea65e61377c4af233c33160ae68b5737

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.