Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25BI0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25BI0032","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION   STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE  STRUCTURE ALONG MAGAT RIVER BAR","GAA 2025 OO-2","Completed",95509568.97,0,100,"Nueva Vizcaya DEO","Region II","DALCON CONSTRUCTION (40601)","2025-02-28","2025-12-16",2025,"Regular Infra - GAA 2025 OO-2",16.57475,121.26085,"205003000","205000000"]
SHA-256
3e6ee849aafd780a935ffb0d2229da44d2608a7a0918922365cdde3a4508376f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.