Project 25C00369
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-25C00369",
"title": "SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN",
"sector": [
"Flood Control and Drainage"
],
"status": "implementation",
"publicAuthority": {
"name": "DPWH Bulacan 3rd DEO"
},
"period": {
"startDate": "2025-03-14"
},
"budget": {
"amount": {
"amount": 95059233.98,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
120.958,
15.134
]
}
}
],
"parties": [
{
"name": "729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.)",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "25C00369",
"summary": {
"title": "SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN",
"status": "active",
"contractValue": {
"amount": 95059233.98,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "On-Going",
"physicalProgressPercent": 50.74,
"fundingSource": "Regular Infra - GAA 2025 SSP",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "0ce8efc776825901844403975951a5e4ea483ba8469e8dbcc8863571abcbd997"
}
}