Project 25CC0086

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CC0086","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL AT BARANGAY IBA IBAYO (PUROK 1 TO PUROK 2), HAGONOY, BULACAN","Flood Control and Drainage","On-Going",69595997.24,0,96.11,"Bulacan 1st DEO","Region III","C.E.M. CONSTRUCTION, INC. (36501)","2025-02-25",null,2025,"Regular Infra - GAA 2025 SSP",14.87654,120.76336,"301407000","301400000"]