Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CD0037

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CD0037","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 01+800 - STA. 01+895 (UBIHAN - LIPUTAN - NAGBALON ROAD DIKE), MEYCAUAYAN CITY, BULACAN","GAA 2025 OO-2","On-Going",93604601.96,0,75.42,"Bulacan 2nd DEO","Region III","729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) (21923)","2025-02-24",null,2025,"Regular Infra - GAA 2025 OO-2",14.7447,120.91909,"301412000","301400000"]
SHA-256
0752fb9c52c26c4a2f0f83f345da5592105c48d4049ef56f3b91acb1cc9e7a36

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.