Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CD0083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CD0083","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE - SANTA MARIA RIVER AND ITS TRIBUTARIES (TABON CREEK) STA. 04+900 - STA. 05+050, ABANGAN NORTE, MARILAO, BULACAN","GAA 2025 OO-2","On-Going",96497006.08,0,100,"Bulacan 2nd DEO","Region III","JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2025-02-24",null,2025,"Regular Infra - GAA 2025 OO-2",14.76879,120.92657,"301404000","301400000"]
SHA-256
cddfc06fd6909a219c589969f2fd7a7d4cab4a7dd7bf871aa7a5dc5fc26bd3dc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.