Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CD0086

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CD0086","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE - SANTA MARIA RIVER AND ITS TRIBUTARIES (TABON CREEK) STA. 04+830 STA. 04+900, ABANGAN NORTE, MARILAO, BULACAN","GAA 2025 OO-2","Completed",48994336.79,0,100,"Bulacan 2nd DEO","Region III","JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2025-03-18","2025-09-10",2025,"Regular Infra - GAA 2025 OO-2",14.76922,120.92727,"301404000","301400000"]
SHA-256
c2d62c88e964e9e3a1a18b0599760ff81af016ed578260e3587d4348db2fffae

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.