Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CE0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CE0008","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALIWAG RIVER, BARANGAY MAPANGPANG, LUPAO, NUEVA ECIJA","Flood Control and Drainage","Completed",96499634.15,0,100,"Nueva Ecija 1st DEO","Region III","IRC CONSTRUCTION & SUPPLIES (29943) / SYMMETRICON BUILDERS CORP. (37555)","2025-02-21","2025-05-21",2025,"Regular Infra - GAA 2025 OO-2",15.80438,120.89251,"304916000","304900000"]
SHA-256
7db48c4bbe12334d8865abd9e9fb6c389604ca22e4b038b42043a82c81d9991e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.