Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CE0282

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CE0282","CONSTRUCTION OF SCHOOL BUILDING, ALIAGA CENTRAL SCHOOL, BARANGAY POBLACION CENTRO, ALIAGA, NUEVA ECIJA","GAA 2025 DEPED BEFF","Completed",4951091.95,0,100,"Nueva Ecija 1st DEO","Region III","IJK MAE CONSTRUCTION INC. (35272)","2025-06-02","2025-09-09",2025,"Outside Infra - GAA 2025 DEPED BEFF",15.50275,120.8433,"304901000","304900000"]
SHA-256
f3320499a5823f1ad5260bbf4b396e8314716f6ee35d594d631b7d8f662c9ed0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.