Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CF0119

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CF0119","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF WATER IMPOUNDING SYSTEM AT TAMBO SWIP, GENERAL TINIO, NUEVA ECIJA","GAA 2025 OO-2","On-Going",9749325.46,0,35.54,"Nueva Ecija 2nd DEO","Region III","JANGAB CONSTRUCTION (58020)","2025-03-24",null,2025,"Regular Infra - GAA 2025 OO-2",15.39075,121.04737,"304910000","304900000"]
SHA-256
a31ea58d7c47a0334b067508f051c2f4ebe56d5a50ecdf641b6de9e8a2f9766b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.