Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CG0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CG0018","FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK (PHASE I), BARANGAY TABUYUC, APALIT, PAMPANGA","GAA 2025 OO-2","On-Going",140401549.83,0,100,"Pampanga 1st DEO","Region III","11-16 CONSTRUCTION (29646)","2025-02-21",null,2025,"Regular Infra - GAA 2025 OO-2",14.95221,120.77472,"305402000","305400000"]
SHA-256
132cc0b62f2e169ec09be0566521ada0fce485635bf1f4328280d45f0b60a587

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.