Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CG0096

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CG0096","BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM FROM PUROK 1 TO PUROK 7, SAN MATEO, ARAYAT, PAMPANGA","Flood Control and Drainage","Completed",5634857.34,0,100,"Pampanga 1st DEO","Region III","R L MONTOYA BUILDERS & CONSTRUCTION INC. (35146)","2025-06-03","2025-09-26",2025,"Regular Infra - GAA 2025 SSP",15.19453,120.8034,"305403000","305400000"]
SHA-256
11efc1cfb403ce7390723e68d4c6f9f237068d3f09ed3dfb491db6b55aa44e3b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.