Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0012","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUNGUN CREEK, PACKAGE H, PANIQUI, TARLAC","GAA 2025 OO-2","Completed",49000000,0,100,"Tarlac DEO","Region III","L.S.D.  CONSTRUCTION & SUPPLIES (8980)","2025-01-27","2025-10-24",2025,"Regular Infra - GAA 2025 OO-2",15.69172,120.55286,"306910000","306900000"]
SHA-256
73f8208960ccdeae1cf748d4af30a1503207b5714ae274f924b04cea1667275a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.