Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0076

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0076","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MORIONES RIVER CONTROL STRUCTURE, (LEFT BANK, SEGMENT 4), TARLAC CITY, TARLAC","Flood Control and Drainage","Completed",96500000,0,100,"Tarlac DEO","Region III","T2B3 BUILDERS AND SUPPLIES CORP. (45138)","2025-02-11","2025-05-19",2025,"Regular Infra - GAA 2025 OO-2",15.45842,120.54403,"306916000","306900000"]
SHA-256
5224b6164af23215bccacb248e67c666dae233d15aa1e445b958662fc9a15f01

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.