Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0114

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0114","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 2), MAYANTOC, TARLAC","GAA 2025 OO-2","On-Going",96500000,0,85.66,"Tarlac DEO","Region III","11-16 CONSTRUCTION (29646)","2025-02-11",null,2025,"Regular Infra - GAA 2025 OO-2",15.62381,120.37062,"306908000","306900000"]
SHA-256
12bb624573e84cf250350d47e84cec2f68058087138bb929e0e1727660a79629

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.