Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0160

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0160","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER, PANIQUI, TARLAC (SEGMENT 29)","GAA 2025 SSP","Completed",74250000,0,100,"Tarlac DEO","Region III","T2B3 BUILDERS AND SUPPLIES CORP. (45138)","2025-04-08","2026-02-03",2025,"Regular Infra - GAA 2025 SSP",15.69314,120.55036,"306910000","306900000"]
SHA-256
f1d8affd8454e1803ec82e5aa6a5b2d47609a3cca59da8bcad920402b14cbf01

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.