Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0164

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0164","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKET-BAKET RIVER, MONCADA, TARLAC (SEGMENT 10)","GAA 2025 SSP","Completed",49500000,0,100,"Tarlac DEO","Region III","MICKAJETTE CONSTRUCTION AND TRADING (35239)","2025-04-08","2026-04-18",2025,"Regular Infra - GAA 2025 SSP",15.72559,120.5745,"306909000","306900000"]
SHA-256
de1e2eff9b45fd617a3829d917dab0a2f203ed144979e651103183d2e5c8eb08

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.