Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0200

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0200","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, LEFT DIKE, BRILLANTE - ADUAS SECTION (ANNEX 9), PANIQUI, TARLAC","GAA 2025 SSP","Completed",96500000,0,100,"Tarlac DEO","Region III","11-16 CONSTRUCTION (29646)","2025-05-16","2026-01-14",2025,"Regular Infra - GAA 2025 SSP",15.65126,120.5304,"306910000","306900000"]
SHA-256
df6015a0640d87a573eb3ad1da70b158c797be0ae4503d4a2c84c858a59da1e0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.