Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CJ0218

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CJ0218","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA LUCIA RIVER (ANNEX 8), PANIQUI, TARLAC","GAA 2025 SSP","On-Going",96500000,0,100,"Tarlac DEO","Region III","11-16 CONSTRUCTION (29646)","2025-05-16",null,2025,"Regular Infra - GAA 2025 SSP",15.70303,120.58031,"306910000","306900000"]
SHA-256
64e00bb7bdd0c4365c5a8de237dd2fffb0e4e6cb3a96da9a685e869352929a15

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.