Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CL0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CL0015","CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 4, SAN FELIPE, ZAMBALES","GAA 2025 OO-2","On-Going",96498952.21,0,50.59,"Zambales 1st DEO","Region III","CDC CONSTRUCTION & SUPPLIES (28275)","2025-02-25",null,2025,"Regular Infra - GAA 2025 OO-2",15.04639,120.11259,"307110000","307100000"]
SHA-256
ada8ef7b1e26f185e009445ace59f9eef63053e91928527b9418c6219a658171

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.