Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CL0256

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CL0256","CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 1)","GAA 2025 SSP","On-Going",48782178.95,0,5.29,"Zambales 1st DEO","Region III","RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION) (32090)","2025-07-18",null,2025,"Regular Infra - GAA 2025 SSP",15.01142,120.14827,"307112000","307100000"]
SHA-256
1663b5e2ea3fbff16e0eb136cbe5ef314865a126391aab4d57b1b1de1a97ed9d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.