Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CP0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CP0027","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG MAASIM RIVER, BARANGAY SAPANG PUTIK, PHASE II, SAPANG PUTIK, SAN ILDEFONSO, BULACAN","GAA 2025 OO-2","On-Going",28949863.55,0,100,"Bulacan 3rd DEO","Region III","AARCON BUILDERS (28336)","2025-06-01",null,2025,"Regular Infra - GAA 2025 OO-2",15.02756,120.96213,"301419000","301400000"]
SHA-256
34159de89a3ff2cc02f451a58cc0a3d219dd643bfcb84aec41ece0b5c3baaf6e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.