Project 25CP0042
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CP0042","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 2)","Flood Control and Drainage","On-Going",47525752.09,0,0,"Bulacan 3rd DEO","Region III","FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)","2025-06-01",null,2025,"Regular Infra - GAA 2025 OO-2",15.18389,120.9625,"301421000","301400000"]
SHA-256
3d8c22b9eed7ff2063f2241e1432c037060bb13bd07aebfe7d95df563ebc7071Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.