Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CP0144

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CP0144","CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRASTRUCTURE PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING/ FACILITIES - CONST. OF REVETMENT ALONG MAGUINAO CREEK, BRGY. MAGUINAO, SAN RAFAEL, BULACAN - PHASE II","Flood Control and Drainage","On-Going",24385762.45,0,0,"Bulacan 3rd DEO","Region III","CALCON ENGINEERING (39961)","2025-07-20",null,2025,"Regular Infra - GAA 2025 SSP",15.01745,120.93234,"301422000","301400000"]
SHA-256
83e1209f2ba0118e99cd8bba40d000d1c657f050f991458a7f0df48effe6f79f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.