Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25CP0153

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25CP0153","CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF SLOPE REVET. STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CONTROL BALAONG - MASALIPI","GAA 2025 SSP","On-Going",98988173.55,0,1.39,"Bulacan 3rd DEO","Region III","CORE CHECK CONSTRUCTION INC. (59155) / TOPNOTCH CATALYST BUILDERS INC. (34061)","2025-04-14",null,2025,"Regular Infra - GAA 2025 SSP",15.145,121.025,"301421000","301400000"]
SHA-256
15d9313af38346547ffa3611c3861deb62b10e941ad20780e3c5e923054d7150

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.