Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25D00128

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25D00128","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MALAKING TUBIG RIVER, PHASE 3, TIAONG, QUEZON","Flood Control and Drainage","On-Going",95051846.44,0,16.02,"Region IV-A","Region IV-A","WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)","2025-04-10",null,2025,"Regular Infra - GAA 2025 OO-2",13.84455,121.38863,"401023000","401000000"]
SHA-256
29e10420ecce573af0fe6a307aebeda28835d4d625eb35346dc7fa1905c982fe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.