Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DB0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DB0030","ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROGRAM-CONSTRUCTION/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BINAMBANG RIVER (UPSTREAM L/S), BALAYAN, BATANGAS","GAA 2025 OO-2","On-Going",93605000,0,49.98,"Batangas 1st DEO","Region IV-A","FRANDEL CONSTRUCTION AND DEVELOPMENT CORP. (36116) / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL (13487)","2025-02-18",null,2025,"Regular Infra - GAA 2025 OO-2",13.94524,120.71762,"401003000","401000000"]
SHA-256
f51297fc3dadf395ac325c734941b9c14b8474b49a95a3300e3ba514f07afe72

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.