Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DB0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DB0033","ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJ FLOODS - FLOOD MANAGEMENT PROG - CONSTRUCTION/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL / SLOPE PROTECTION, BARANGAY ZONE 4, TAAL, BATANGAS","GAA 2025 OO-2","On-Going",9502800,0,39.88,"Batangas 1st DEO","Region IV-A","RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON (31157)","2025-04-11",null,2025,"Regular Infra - GAA 2025 OO-2",13.87879,120.91856,"401029000","401000000"]
SHA-256
95bf073c8368d2015f8e2b1c93437bc281517697763234c77ede537d7c72c536

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.