Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DB0108

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DB0108","ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJ FLOODS- FLOOD MANAGEMENT PROG- CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL PROTECTION STRUCTURE, BARANGAY CARRENAHAN, BALAYAN,BATANGAS","GAA 2025 OO-2","Completed",19012000,0,100,"Batangas 1st DEO","Region IV-A","11-16 CONSTRUCTION (29646)","2025-03-31","2025-11-29",2025,"Regular Infra - GAA 2025 OO-2",13.9307,120.75955,"401003000","401000000"]
SHA-256
fc2b8d225740ac30bdc77d1c15e32911285e349501c3627a7652134269aeb240

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.