Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DB0220

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DB0220","CONSTRUCTION OF SCHOOL BUILDING, JOSE LOPEZ, MANZANO NATIONAL HIGH SCHOOL, BARANGAY MATAYWANAC, TUY, BATANGAS","GAA 2025 DEPED BEFF","On-Going",16716692.37,0,18.12,"Batangas 1st DEO","Region IV-A","816 EMBER CONSTRUCTION CORPORATION (51107)","2026-07-01",null,2025,"Outside Infra - GAA 2025 DEPED BEFF",null,null,null,"401000000"]
SHA-256
1a768c4a91fa169477087d50420e7c3751881f059eaf9655c775960bfa6a7ef8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.