Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DF0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DF0127","CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAHABANG KAHOY, INDANG, CAVITE","Buildings and Facilities","On-Going",4798239.45,0,29.02,"Cavite 1st DEO","Region IV-A","T.E. TRINIDAD CONSTRUCTION (43287)","2025-03-31",null,2025,"Regular Infra - GAA 2025 SSP",14.1536,120.9194,"402110000","402100000"]
SHA-256
7c746680651d394089edc89c33dacd24e670e6e8201287edd9b833cb26674508

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.