Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DM0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DM0024","CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NAVITAS, CATANAUAN, QUEZON","GAA 2025 SSP","Completed",7125440.64,0,100,"Quezon 3rd DEO","Region IV-A","JSP CONSTRUCTION (12517)","2025-02-12","2025-10-02",2025,"Regular Infra - GAA 2025 SSP",13.66185,122.29692,"405610000","405600000"]
SHA-256
f478d17d71f531ea017adffa66c3e186b8f1dbc987d00f794d75c35fa85cf397

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.