Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25DQ0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25DQ0005","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, PHASE 1, BARANGAY MABOLO II, BACOOR CITY, CAVITE","Flood Control and Drainage","On-Going",143281999.19,0,82.11,"Cavite 3rd DEO","Region IV-A","GRAIA CONSTRUCTION CORPORATION (30826)","2025-04-16",null,2025,"Regular Infra - GAA 2025 OO-2",14.45257,120.93368,"402103000","402100000"]
SHA-256
4b5d7c31033ebbe19d63eb2e3f695feb00b27ac9262b1d0ef21940313c5e1573

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.