Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25E00183

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25E00183","CONST. OF MISSING LINKS/NEW ROADS- MINDORO ISLAND CIRCUMFERENTIAL ROAD (PUERTO GALERA-ABRA DE ILOG), PACKAGE D, STA. 0+000-STA. 0+510; STA. 3+978-STA. 4+194, ABRA DE ILOG, OCC. MINDORO","GAA 2025 OO-1","On-Going",70782765.86,0,0,"MIMAROPA Region","MIMAROPA Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2025-03-12",null,2025,"Regular Infra - GAA 2025 OO-1",null,null,null,null]
SHA-256
70c560299d9148029d98aa8b4b4518166c01b85eb77cb1ff5b87f6a2e56afd4c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.