Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25E00203

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25E00203","BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (UPSTREAM), BRGY. MURTHA, STA. 000+000-STA. 000+465.82, SAN JOSE, OCC. MINDOR","GAA 2025 SSP","On-Going",236859432.74,0,71.31,"MIMAROPA Region","MIMAROPA Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2025-05-28",null,2025,"Regular Infra - GAA 2025 SSP",12.45021,121.1153,"1705110000","1705100000"]
SHA-256
8c4b9c0d19093c4916ea95d7847920ee9214e6abd21f2860b8b24484aee75383

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.