Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25E00268

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25E00268","FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (UPSTREAM), STA. 000+330-STA. 000+649.50, BONGABONG, OR. MINDOR","GAA 2025 OO-2","On-Going",231473801.72,0,48.39,"MIMAROPA Region","MIMAROPA Region","JJPR CONSTRUCTION SERVICES (53478)","2025-03-12",null,2025,"Regular Infra - GAA 2025 OO-2",12.68749,121.37988,"1705203000","1705200000"]
SHA-256
134d19d01e010ab6002dc9b9609f88cb457ee4980cd6bd9ac3c2dafcdac75b9b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.