Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EA0047

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EA0047","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PROTECTION WORKS, BAGTINGON SRIP, BUENAVISTA, MARINDUQUE","GAA 2025 OO-2","Completed",14405235.18,0,100,"Marinduque DEO","MIMAROPA Region","G.T.J. CONSTRUCTION (42452)","2025-02-21","2025-12-05",2025,"Regular Infra - GAA 2025 OO-2",13.29422,121.94197,"1704002000","1704000000"]
SHA-256
9665bb3118163cc86ece0e5a5f26240b85b91babe55f5e6598fad15bf84c8861

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.