Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EF0044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EF0044","CONSTRUCTION OF MALINAO RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN","GAA 2025 OO-2","On-Going",39115237.17,0,100,"Palawan 2nd DEO","MIMAROPA Region","IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) (24093)","2025-04-11",null,2025,"Regular Infra - GAA 2025 OO-2",9.24764,118.36909,"1705315000","1705300000"]
SHA-256
a2744111ee863d39f8cbbdd47a134e2e6046fd9ca32785118dfaf1fc24c979f8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.