Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0014","CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), GUINBIRAYAN NATIONAL HIGH SCHOOL, BARANGAY GUINBIRAYAN, STA. FE, ROMBLON","GAA 2025 SSP","On-Going",4873159.08,0,99.27,"Romblon DEO","MIMAROPA Region","EMQ DESIGN & CONSTRUCTION (16128)","2025-03-24",null,2025,"Regular Infra - GAA 2025 SSP",12.17314,122.03461,"1705915000","1705900000"]
SHA-256
bce9a6dcd64c6e5552b2e214efc945ece3704f8ec02e17493277d4d2ddc13299

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.