Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0032","CONSTRUCTION OF JAO-ASAN FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY JAO-ASAN, MAGDIWANG, ROMBLON","GAA 2025 OO-2","On-Going",48007790.92,0,100,"Romblon DEO","MIMAROPA Region","SCATR CONSTRUCTION (47498)","2025-04-11",null,2025,"Regular Infra - GAA 2025 OO-2",12.47255,122.52272,"1705908000","1705900000"]
SHA-256
b121f1be9d36b917c79dcefbfcd24f8130f5f5988fbc87246b589d84e1da7441

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.