Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0034","CONSTRUCTION OF PILI FLOOD CONTROL STRUCTURE PHASE 2, BARANGAY PILI, SAN FERNANDO, ROMBLON","GAA 2025 OO-2","On-Going",141048958.41,0,89.64,"Romblon DEO","MIMAROPA Region","SCATR CONSTRUCTION (47498)","2025-03-24",null,2025,"Regular Infra - GAA 2025 OO-2",12.31105,122.59538,"1705913000","1705900000"]
SHA-256
204e0d9f8ee54f2ecb8d9245071ce439f53c68b34a23ab5aad2766e4bf8d44fe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.