Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0041","CONSTRUCTION OF SEAWALL ALONG POBLACION LEADING TO AMBULONG, PHASE 2, MAGDIWANG, ROMBLON","GAA 2025 SSP","On-Going",71290017.42,0,100,"Romblon DEO","MIMAROPA Region","E.K. CO CONSTRUCTION & SUPPLY (48921) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2025-05-22",null,2025,"Regular Infra - GAA 2025 SSP",12.49434,122.51357,"1705908000","1705900000"]
SHA-256
69edfa390a3b4abd4cf3ec880d621674e2c3c5fe322d8e8c8176a33c85691204

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.