Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0050","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CABITANGAHAN BARANGAY TACLOBO, SAN FERNANDO, ROMBLON","GAA 2025 SSP","On-Going",145534217.57,0,100,"Romblon DEO","MIMAROPA Region","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2025-05-23",null,2025,"Regular Infra - GAA 2025 SSP",12.35624,122.54964,"1705913000","1705900000"]
SHA-256
2af899e0f1ba3bfdfa8edd93f80887b1e289745189719172e6c30ce5416d2d5b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.